Experts teach you a comprehensive inspection of laminate flooring and solid wood flooring

The process of laminate flooring and parquet is basically the same. Currently, the more common method on the market is suspension paving.

1, grassroots processing

The first step in paving the floor is the base treatment. The basic treatment is mainly carried out on the five major problems of “sand, tide, concave, convex and crack” on the ground. The problem ground is repaired to form a new base layer, avoiding the floor arching caused by the original base layer hollow and crack.

2, leveling the ground

After the grassroots level is completed, it is necessary to level the ground. If the ground is not flat, not only will the skirting line have a gap, the overall floor will be uneven, and there will be abnormal noise, which will seriously affect the quality of the floor.

The self-leveling leveling construction is a relatively advanced ground construction technology on the market, which can ensure that the height difference of the original ground is no more than 3 mm per square meter. During the construction, the worker mixes a variety of materials with water to form a liquid substance. After pouring it into the ground, the liquid substance can flow according to the level of the ground, automatically leveling the ground, and drying quickly. The ground will form a smooth, flat, seamless new base.

Self-leveling can make the ground more flat and ensure the quietness of the floor. At the same time, it will make the ground stronger and avoid arching under the floor. In addition, there is no air barrier between the ground and the floor, which increases the thermal conductivity of the ground. If you are doing general cement leveling, be sure to leave time for the cement to dry out. It cannot be installed when there is moisture on the ground. There is a simple method for measuring moisture. Cover it with a plastic film of 60 cm square on the ground and seal it around. After 24 hours, observe that there is no gas in the film. If there is moisture in the film, it cannot be installed. In addition, if the ground is every The height difference of square meters is more than 5 mm and it cannot be installed.